DTBD05015Rancho Seco Nuclear Generating StationRevision No. 0Decommissioning Technical Basis DocumentDPT 05076 RIC 2A.900Rancho Seco Nuclear Generating Station Structure Nuclide Fraction and DCGLsPREPARED.
How It Works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
Tips on how to fill out, edit and sign Llc online
How to fill out and sign Scabble online?
Get your online template and fill it in using progressive features. Enjoy smart fillable fields and interactivity. Follow the simple instructions below:
Are you still searching for a quick and efficient tool to complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho Seco at a reasonable price? Our platform gives you a rich library of forms that are offered for completing on the internet. It only takes a few minutes.
Follow these simple instructions to get Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho Seco completely ready for sending:
- Get the sample you require in our collection of templates.
- Open the form in our online editing tool.
- Look through the guidelines to determine which details you must provide.
- Select the fillable fields and put the requested data.
- Add the date and place your e-signature when you complete all other boxes.
- Examine the document for misprints along with other errors. In case you necessity to correct something, our online editor along with its wide range of tools are at your disposal.
- Download the new document to your gadget by hitting Done.
- Send the electronic form to the parties involved.
Filling in Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho Seco does not need to be complicated any longer. From now on simply cope with it from your apartment or at your office straight from your smartphone or personal computer.
How to edit 241c: customize forms online
Check out a standalone service to take care of all your paperwork with ease. Find, edit, and finish your 241c in a single interface with the help of smart instruments.
The times when people had to print out forms or even write them manually are over. These days, all it takes to get and finish any form, like 241c, is opening just one browser tab. Here, you can find the 241c form and customize it any way you need, from inserting the text directly in the document to drawing it on a digital sticky note and attaching it to the record. Discover instruments that will simplify your paperwork without additional effort.
Simply click the Get form button to prepare your 241c paperwork easily and start modifying it instantly. In the editing mode, you can easily fill in the template with your details for submission. Just click on the field you need to change and enter the data right away. The editor's interface does not need any specific skills to use it. When finished with the edits, check the information's accuracy once more and sign the document. Click on the signature field and follow the instructions to eSign the form in a moment.
Use More instruments to customize your form:
- Use Cross, Check, or Circle instruments to pinpoint the document's data.
- Add textual content or fillable text fields with text customization tools.
- Erase, Highlight, or Blackout text blocks in the document using corresponding instruments.
- Add a date, initials, or even an image to the document if necessary.
- Use the Sticky note tool to annotate the form.
- Use the Arrow and Line, or Draw tool to add graphic components to your document.
Preparing 241c forms will never be perplexing again if you know where to look for the suitable template and prepare it quickly. Do not hesitate to try it yourself.
Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.
Sc02a FAQ
-
Background. Rancho Seco is a 913-megawatt Babcock & Wilcox design nuclear power plant owned by the Sacramento Municipal Utility District that began commercial operation in 1975. It was shut down in June 1989 as the result of a voter referendum.
-
But when Measure K again asked voters in 1989 whether to keep Rancho Seco open, customers were fed up. On June 6, 1989, Measure K was defeated by a margin of more than 13,000 votes, and the plant began the process of shutting down the next day. Measure K did more than just shut down the plant, too.
-
Diablo Canyon is slated to close for several reasons, including that its power prices in recent years have exceeded those of solar or even natural gas — before gas prices spiked this year. California has a moratorium on new nuclear plants until a solution is found for radioactive waste.
-
The Rancho Seco Nuclear Power Plant, located about 25 miles south of Sacramento, is owned by the Sacramento Municipal Utility District. The 913 MW Pressurized Water Reactor was operation from April 1975 to June 7, 1989. It was closed by public referendum.
-
During Rancho Seco's 14-year operating period, materials became contaminated with radioactivity and 493 nuclear fuel rods became used. Radiological decommissioning of the facility requires that radioactivity be reduced to meet Nuclear Regulatory Commission (NRC) criteria for safety.
Mrem Related content
-
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
confirmatory survey results for the
by CA Wade · 2006 — Decommissioning Technical Basis Document: Structure. Nuclide...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
confirmatory survey results for the
by CA Wade · 2006 — Decommissioning Technical Basis Document: Structure. Nuclide...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
Integrated Data Base Report—1994: U.S. Spent...
Sep 11, 1995 — APPENDIX D. INTEGRATED DATA BASE DOCUMENT ACCESS ON THE INTERNET...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
Integrated Data Base Report—1994: U.S. Spent...
Sep 11, 1995 — APPENDIX D. INTEGRATED DATA BASE DOCUMENT ACCESS ON THE INTERNET...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
25 Jan 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
16 Jan 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Preliminary surface soil Derived Concentration...
the U.S. pressurized water reactors (PWRs, e.g. Rancho Seco, Zion. NPP), a suite of...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
Integrated Data Base Report—1994: U.S. Spent...
Sep 11, 1995 — APPENDIX D. INTEGRATED DATA BASE DOCUMENT ACCESS ON THE INTERNET...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
25 Jan 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
16 Jan 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Preliminary surface soil Derived Concentration...
the U.S. pressurized water reactors (PWRs, e.g. Rancho Seco, Zion. NPP), a suite of...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
confirmatory survey results for the
by CA Wade · 2006 — Decommissioning Technical Basis Document: Structure. Nuclide...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
The Electric Power Research Institute (EPRI) conducts research, development, and...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Preliminary surface soil Derived Concentration...
the U.S. pressurized water reactors (PWRs, e.g. Rancho Seco, Zion. NPP), a suite of...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
One of the key objectives of the EPRI Decommissioning Technology Program is to capture the...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
confirmatory survey results for the
by CA Wade · 2006 — Decommissioning Technical Basis Document: Structure. Nuclide...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
25-Jan-2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
16-Jan-2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
confirmatory survey results for the
by CA Wade · 2006 — Decommissioning Technical Basis Document: Structure. Nuclide...
Learn more -
Rancho Seco Nuclear Generating Station...
The Electric Power Research Institute (EPRI) conducts research, development, and...
Learn more -
Preliminary surface soil Derived Concentration...
the U.S. pressurized water reactors (PWRs, e.g. Rancho Seco, Zion. NPP), a suite of...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Jan 25, 2006 — DECOMMISSIONING TECHNICAL BASIS DOCUMENT. NUMBER: DTBD-05-015. REVISION:...
Learn more -
Rancho Seco Nuclear Generating Station...
Jan 16, 2006 — Rancho Seco Nuclear Generating Station. Decommissioning Technical Basis...
Learn more -
Get the free Rancho Seco, Decommissioning...
DTBD05015Rancho Sect Nuclear Generating StationRevision No. 0Decommissioning Technical...
Learn more -
Rancho Seco, Decommissioning Technical Basis...
Complete Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho...
Learn more -
Confirmatory Survey Results for the Auxiliary...
by WC Adams · 2007 — Rancho Seco Decommissioning Plan which was approved by the NRC in...
Learn more -
Preliminary ALARA residual radioactivity levels...
by HW Seo · 2022 · Cited by 1 — 1 (1995). NUREG/CR-5884, PNL-8742. [9]. RSNGS. Rancho...
Learn more -
Rancho Seco Nuclear Generating Station...
The Electric Power Research Institute (EPRI) conducts research, development, and...
Learn more -
A Radionuclides Suite Selection for Site...
Journal of Nuclear Fuel Cycle and Waste Technology Vol.14 No.3 pp.267-277 ... NRC)...
Learn more -
Preliminary surface soil Derived Concentration...
the U.S. pressurized water reactors (PWRs, e.g. Rancho Seco, Zion. NPP), a suite of...
Learn more
Related links form
Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.
Keywords relevant to Rancho Seco, Decommissioning Technical Basis Document DTBD-05-015 Rev. 0, "Rancho Seco
- 000E00
- dcgls
- seco
- dpm
- nuclides
- scoia
- sc02a
- mrem
- llc
- sc01a
- pCi
- scabble
- 241c
- 050e03
- O1
USLegal fulfills industry-leading security and compliance standards.
-
VeriSign secured
#1 Internet-trusted security seal. Ensures that a website is free of malware attacks.
-
Accredited Business
Guarantees that a business meets BBB accreditation standards in the US and Canada.
-
TopTen Reviews
Highest customer reviews on one of the most highly-trusted product review platforms.