Loading
             
                Get Letter Of Concurrence For Setback Waiver Letter Of Concurrence For Setback Waiver - Dep State Fl
How it works
- 
                    Open form follow the instructions
- 
                    Easily sign the form with your finger
- 
                    Send filled & signed form or save
How to fill out the LETTER OF CONCURRENCE FOR SETBACK WAIVER online
Filling out the Letter of Concurrence for Setback Waiver is a vital step for adjacent property owners who wish to provide their consent for a proposed structure located within setback limits. This guide will help you navigate the online process efficiently.
Follow the steps to complete your form accurately.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- In the first section, fill in the name of the owner or applicant and their project address. It is essential that this information is accurate to avoid any potential delays in processing.
- Next, enter the file number associated with the project. This information helps reference the specifics of the application that you are addressing.
- Identify yourself as the adjacent property owner and provide your name and address in the designated fields. Ensure that this matches public records for clarity.
- Indicate the direction of your property in relation to the proposed project (north, south, east, or west). This information is required to clarify your position relative to the applicant's site.
- Acknowledge that you understand the proposed project will be within the applicant's riparian rights area and that you do not object to any construction within the setback area. This section is a critical affirmation of your concurrence.
- Sign and date the form where indicated. An original signature is required to validate the letter of concurrence. Remember to print your name below your signature.
- For the subsequent page, insert the required drawing, sketch, or survey that clearly illustrates the proposed dock location, highlighting the distance from the riparian rights lines.
- Finally, initial and date the drawing section to confirm its accuracy as related to the waiver application.
- Once you have completed the form, save your changes, download, print, or share the document according to your needs.
Complete your documents online today to streamline your process.
Related links form
General setbacks of all structures from wetlands are 15-foot minimum, 25-foot average, unless located in the WRPA or the Econ. Within WRPA or the Econ, setbacks of all structures from wetlands are 25-foot minimum, 50-foot average. Building setbacks from natural water bodies are measured from the normal high water line.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
        - 
                    In businnes since 199725+ years providing professional legal documents.
- 
                    Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
- 
                    Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.