Loading
Get Workover & Drilling Rig Model Lci-1000c, Double Drum - 40c
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to use or fill out the WORKOVER & DRILLING RIG MODEL LCI-1000C, DOUBLE DRUM - 40C online
Filling out the WORKOVER & DRILLING RIG MODEL LCI-1000C, DOUBLE DRUM - 40C form requires careful attention to detail to ensure all information is accurately recorded. This guide provides clear, step-by-step instructions to help you complete the form efficiently and effectively.
Follow the steps to fill out the form correctly.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Review the form sections and identify the fields required for your submission. Begin filling out the general information section including the company name, contact person, and date.
- Move on to SECTION 1.0 and detail the specifications for the 7 AXLE RIG ASSY. Include particulars such as drawworks, brake systems, and mast specifications.
- Proceed to SECTION 2.0 and describe the substructure and accessories, ensuring to note any modifications or specifics related to cold weather operations.
- In SECTION 3.0, outline miscellaneous equipment that is essential for the operation of the rig, detailing each component and its specifications.
- Continue to SECTION 4.0 and fill out any instrumentation details needed for the rig operations, noting the measurements and standards applicable.
- Complete SECTION 5.0, confirming all cold weather equipment and features, ensuring they align with operational capabilities for -40°C conditions.
- In SECTION 6.0, describe the rig-up, test, and rig-down procedures to ensure clarity on operational protocols.
- Finalise SECTION 7.0 and 8.0 by providing details on training, commissioning, and the required documentation necessary for the rig setup.
- Once all sections are complete, review the form for accuracy, save changes, and choose to download, print, or share the completed document as needed.
Begin filling out your documents online today to ensure precise and timely submissions.
Workover operations mean the work conducted on wells after the initial well-completion operation for the purpose of maintaining or restoring the productivity of a well. Well completion/well workover means those operations following the drilling of a well that are intended to establish or restore production.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.