
Get Hud-npma-99-b 2018-2025
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the HUD-NPMA-99-B online
This guide provides a step-by-step approach to filling out the HUD-NPMA-99-B form online. It is designed to assist users in completing the document accurately and efficiently while ensuring all necessary information is included.
Follow the steps to complete the HUD-NPMA-99-B form online.
- Click ‘Get Form’ button to access the HUD-NPMA-99-B form and open it in your preferred online editor.
- In Section 1, enter the pest control company's information, including the company name, address, business license number, and phone number.
- If applicable, input the FHA/VA case number in the designated field.
- Proceed to Section 2 and provide the builder's company name and phone number.
- In Section 3, fill out the location of the structure treated by providing the street address or legal description, along with the city, state, and zip code.
- For Section 4, record the date(s) of service. Additionally, check the box that corresponds to the type of construction utilized: slab, basement, crawl, or other.
- Under the 'Check all that apply' section, detail the type of treatment performed. For soil-applied liquid termiticide, provide the brand name, EPA registration number, approximate dilution percentage, and total gallons mixed and applied.
- For wood-applied liquid termiticide, fill in similar details as above, including checking 'Yes' or 'No' for treatment completed on the exterior.
- If bait systems were installed, indicate the name of the system, EPA registration number, and the number of stations installed.
- For physical barrier systems, provide the name of the system installed and attach any required installation information.
- In the 'Attachments' section, list any additional documents you are including with the form.
- Add any relevant comments in the comments section to clarify any points as needed.
- Complete the applicator’s name and certification number if required by state law.
- Ensure the authorized signature is included along with the date of completion.
- After verifying all information is accurate, you can save changes, download, print, or share the completed form.
Begin filling out the HUD-NPMA-99-B form online to ensure proper termite treatment documentation.
A termite inspection is only required by FHA in a few difference circumstances: if there is evidence of an active infestation, or if a termite inspection is mandated by the state or required by the lender.
Fill HUD-NPMA-99-B
This form requires a licensed Pest Control company to send to the builder as a record of specific treatment information for the prevention of termites. Form HUD-NPMA-99B is also known as the New Construction Subterranean Termite Service. The NPMA 99B form, also known as the Wood-Destroying Insect Inspection Report, is a document used in the real estate industry. HUD-NPMA-99-B is the New Construction Subterranean Termite Soil Treatment Record Form. The HUD-NPMA-99-B form is a termite-related document. When applicable, form HUD-NPMA-99-B must accompany the form HUD-NPMA-99-A.
Industry-leading security and compliance
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.