Loading
Get Mtk Manual Pg1 - Monster Tower
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the MTK Manual Pg1 - Monster Tower online
Filling out the MTK Manual Pg1 - Monster Tower is a straightforward process that requires careful attention to detail. This guide provides you with step-by-step instructions to ensure that you complete the form accurately and efficiently.
Follow the steps to fill out the MTK Manual Pg1 - Monster Tower online
- Click the ‘Get Form’ button to access the document and open it in the editor.
- Begin by taking inventory of the MTK parts, hardware, and tools required for installation, as outlined in the document. This ensures you have everything necessary before proceeding.
- Familiarize yourself with the components of the Monster Tower, including the Top Section, Right Leg, Left Leg, and Adjustable Mounting Bases. Understanding these parts is crucial for accurate installation.
- Decide on the folding option for your tower (either forward or back folding) as this will influence the placement of the mounting bases on your boat.
- Measure the width of your boat and ensure the legs of the tower are positioned accordingly by attaching them to the Top Section with the provided bolts.
- Attach the Heim Joints to the base of each leg, ensuring they are secured firmly before proceeding to the next step.
- Assemble the bases and attach them to the legs using the appropriate bolts. This will allow the bases to pivot and swivel as intended.
- Locate and attach the bases to the deck of your boat, ensuring all markings and measurements are accurate before drilling any holes.
- After securing the bases to the deck, reassemble and adjust the positioning of the legs to ensure maximum stability and contact with the boat.
- Perform final adjustments, centering the tower and tightening all bolts to ensure it is securely locked in place.
- After installation, ensure to review all fasteners and connections are tight, particularly the bolts connecting the Top Section to the Legs.
- Once the installation is complete, your MTK is ready for use. Remember to follow all operational guidelines provided in the manual.
Complete your document online to ensure a successful installation of your MTK.
Related links form
To fold the tower down remove the Quick Release bolts from the front bases. The Heim joints now allow the tower to pivot towards the back of the boat. If the tower rests on fiberglass, use a vest or other cushion to protect the boat and tower.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.