How to fill out the Framing Inspection Checklist online
The Framing Inspection Checklist is a vital document used to ensure that all structural components of a building meet safety and code requirements. This guide provides step-by-step instructions to help you accurately complete the checklist online.
Follow the steps to complete the Framing Inspection Checklist online.
- Press the ‘Get Form’ button to access the Framing Inspection Checklist and open it in your editing tool.
- Begin with the first section by verifying that all anchor bolts have been installed correctly, ensuring they are within 12 inches of the bottom plate break and that they are secured with washers and nuts.
- Check all top and bottom plate holes, as well as any floor penetrations, and make sure they are sealed properly.
- Verify that horizontal penetrations are sealed every 10 feet. This is critical to maintaining structural integrity.
- Ensure that windows and exterior bottom plates are sealed correctly to prevent water intrusion.
- Confirm that there is a strong back with diagonal bracing on all gables, following the manufacturer's instructions for installation.
- Review lateral bracing according to the specifications provided in the individual truss papers.
- Nail all truss hangers, ensuring that all round holes are filled adequately.
- Repeat the nailing process for joist hangers, filling all round holes.
- For top plate breaks occurring within 24 inches, strap them with a 16 gauge strap and secure with 6-16d nails on each side of the break.
- Check for a positive connection on all posts and beams ensuring their stability.
- Firestop all top and bottom of all chases to ensure fire compliance.
- Verify that all joists, including those for stair landings, have appropriate hangers.
- Strap any beams to top plates where they pass through the top plate.
- Nail all beam pockets securely.
- Nail all corner studs using two rows of 16d nails spaced 24 inches on center.
- Ensure that all roof ventilation has been installed properly, and confirm the roof is complete before proceeding with the framing inspection.
- Consult with the joist or truss company for fixes regarding any cut or damaged joists or trusses.
- Toe nail the rim board to the sill plate at 6 inches on center.
- Add studs beneath all double girder trusses and double joists for adequate support.
- Ensure that smoke detectors are installed in all sleeping rooms and outside each sleeping area, positioned within 15 feet and at least 3 feet away from air returns.
- Fire block the staircases and seal any holes present in fire blocks.
- Maintain a maximum stud spacing of 24 inches on center.
- Transfer all point loads to the crawl space as necessary.
- Install sheetrock backing in tub and shower stalls, securing it to the walls.
- Provide individual truss papers and ensure approved plans and joist layouts are included.
- Clean the crawl space adequately, removing all debris.
- Block all trusses at bearing locations as indicated in the truss papers.
- Block all joists at bearing walls for proper support.
- Confirm that all electrical work has been completed and approved by Labor & Industries.
- Ensure that all other necessary inspections have been completed prior to the framing inspection.
- Block any short joists to the rim board to maintain structural integrity.
- Provide full support beneath the heels of all rafters.
- Check for tempered glass installations in required areas.
- Lastly, verify that the house is built according to the approved plans. If there are any changes, submit them for review and approval to the Building Department office before the framing inspection.
- After completing the checklist, save your changes, and consider downloading, printing, or sharing the form as necessary.
Complete your documents online today to ensure compliance and efficiency.
How to prepare a Quality Checklist Template Start with inspection checklist templates. Customize checklists for your project and scope of work. Prepare project-specific checklists "just-in-time" Keep checklists short and focused. Organize checklists the way you will inspect. Refine your checklists continuously.
Fill Framing Inspection Checklist
This checklist is intended for use to prepare for an inspection. This is only a general list and is not intended to address all possible conditions. Check that all roof ventilation has been installed. â–¡. Roof must be complete before framing inspection. â–¡. This checklist is provided as a reference tool, and it is not intended to be exhaustive of all possible requirements. Polythene fixed to bottom plate (brick veneer)3. Listed below are the inspection elements and prompts within each element. Please note that not all elements will be relevant for your project. Are all gas lines labeled? Are the shutoff valves and cleanouts accessible?
Industry-leading security and compliance
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.