Loading
             
                Get 780 0701 F
How it works
- 
                    Open form follow the instructions
- 
                    Easily sign the form with your finger
- 
                    Send filled & signed form or save
How to fill out the 780 0701 F online
Filling out the 780 0701 F form online may seem daunting, but this guide will walk you through each section step-by-step. By following these instructions, you can complete the construction permit application with confidence.
Follow the steps to complete the 780 0701 F form effectively.
- Press the ‘Get Form’ button to access the online version of the 780 0701 F form.
- Begin by entering the name of the project. Ensure that you specify the type of construction, followed by related identifiers such as the name of the development, city, water district, or others.
- List all documents submitted. Make sure to note that two copies are required for each document, including items such as engineering reports, plans, specifications, and other relevant documents as indicated.
- Indicate the nature of the project, choosing between the development of a new water supply system or modifications to an existing system. If it is a new system, leave the identification number blank.
- Provide a comprehensive scope of the project. Describe everything in detail, and if necessary, attach additional sheets for clarity.
- Fill out the location details using the U.S. Geological Survey format, including county, section, township, and range as applicable.
- Specify the proposed water supply source, choosing from well(s), stream, river, lake, reservoir, or purchase. Include the name of the supplier if applicable.
- Detail the characteristics of water lines, including whether you're proposing a complete distribution system, extension, relocation, or other specifics. Include flow and pressure information.
- Describe any storage requirements, noting the type of storage tanks and their dimensions and capacities.
- Outline the proposed treatment methods that will be provided. List chemicals used and processes involved.
- Provide information on the number of pumps and their capacities, including types of pumping required for the project.
- Include details about waste disposal facilities, their number, capacity, and any relevant specifications.
- If applicable, mention other water works related to your project.
- Complete the section for owner or official custodian by providing your name, address, and signature. Add the date and print your name below the signature line.
- Review all entered information for accuracy. Once complete, save changes, download, print, or share the form as needed.
Complete your 780 0701 F form online today to streamline your construction permit application process.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
        - 
                    In businnes since 199725+ years providing professional legal documents.
- 
                    Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
- 
                    Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.