Loading
Get Qleave Finalisation Form
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Qleave Finalisation Form online
The Qleave Finalisation Form is essential for completing your obligations in the building and construction industry. This guide will walk you through each section of the form, ensuring you provide accurate and complete information while filing online.
Follow the steps to complete the form with ease.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Enter the QLeave levy number. This number uniquely identifies your project and is required for tracking.
- Enter your customer number to link your submission to your profile in the Qleave system.
- Provide your contact name. This ensures the relevant administrative staff can reach you if needed.
- Fill in the building and construction work description, detailing the nature of the completed work.
- Add the work address to specify where the construction took place.
- If applicable, enter your job or reference number to assist in identifying your project.
- Indicate whether the building and construction work has ended by selecting YES or NO.
- If you selected NO, provide the new anticipated end date. If YES, state the actual end date of the work.
- Next, report the final cost of work, which includes all relevant expenses incurred, whether direct or indirect.
- If applicable, list any exempted work costs included in the final total.
- For invoice details, select the relevant category; GOVT, NSE, NPO, or MINE, and provide necessary alternative contact details as needed.
- Complete the declaration to confirm the accuracy of the information provided.
- Type your name in the signature field if filing electronically to validate your submission.
- Finally, save your changes, then download or print the form for your records.
Complete your Qleave Finalisation Form online today for a seamless submission experience.
The total levies are 0.575% of the total cost of work, comprised of: Portable Long Service Leave Levy at 0.35% Work Health and Safety Levy at 0.125% Construction Skills Queensland Levy at 0.1%