Loading
             
                Get Application - Progress Energy
How it works
- 
                    Open form follow the instructions
- 
                    Easily sign the form with your finger
- 
                    Send filled & signed form or save
How to fill out the Application - Progress Energy online
Filling out the Application - Progress Energy online can seem daunting, but this guide will simplify the process for you. We will walk you through each section of the application, ensuring you provide all necessary information accurately and efficiently.
Follow the steps to complete the application with ease.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Begin with Part A, Applicant Information. Fill in your name, mailing address, city, street address (if different), daytime phone number, DEF account number, zip code, fax number, and email address.
- Proceed to System Information. For System 1, indicate the type of system by checking the appropriate box (Wind, Solar, or Other). Provide the system name/model, capacity in watts (DC), and the manufacturer/model for the generator/modules, inverter, and batteries (if applicable). Also, include the system location and inverter location.
- Answer the permission to monitor with a check in the corresponding box for 'Yes' or 'No'. Repeat the same information for System 2 if applicable.
- For Part C, provide the installation contractor's information including their name, address, city, FL license number, zip code, daytime phone number, proposed installation date, fax number, and email address.
- In Part D, confirm that the hardware and installation comply with the specified standards by having the contractor sign and print their name, along with the date and their company name.
- Next, in Part E, the system owner needs to acknowledge satisfaction with the installation. The owner must sign and date this section.
- Complete Part F by stating whether the installation satisfies code requirements. Provide the inspector's printed name and signature, along with the date.
- Finally, in Part G, obtain the approval from Duke Energy Florida, Inc. This includes providing the DEF representative's printed name, signature, and date.
- After all sections have been filled out, review the application for accuracy. Save your changes, download the document for your records, print a copy, or share it as needed.
Get started on completing the application online today!
The time it takes to turn on your utilities can vary based on several factors, such as your location and the type of service needed. Typically, after submitting the Application - Progress Energy, you can expect a response within a few business days. It is wise to schedule your utility activation in advance, especially if you are moving into a new home. This way, you ensure everything is ready when you arrive.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
        - 
                    In businnes since 199725+ years providing professional legal documents.
- 
                    Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
- 
                    Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.