Loading
             
                Get Bwp Aq 06 - Mass.gov - Mass
How it works
- 
                    Open form follow the instructions
- 
                    Easily sign the form with your finger
- 
                    Send filled & signed form or save
How to use or fill out the BWP AQ 06 - Mass.Gov - Mass online
The BWP AQ 06 form is essential for notifying the Massachusetts Department of Environmental Protection about construction or demolition projects that may involve asbestos. This guide provides clear, step-by-step instructions for completing the form online, ensuring compliance with relevant regulations.
Follow the steps to fill out the BWP AQ 06 form online.
- Press the ‘Get Form’ button to access the BWP AQ 06 form and open it in your preferred editor.
- Begin filling out the General Project Description section. Start with the Facility Information, including the facility name, city or town, street address, state, zip code, telephone number, contact person's name and title, contact person's phone number, contact person's email, facility size in square feet, number of floors, whether the facility was built prior to 1980, and a description of its current or prior use.
- Indicate whether the facility is a residential facility and specify the number of units if applicable.
- Complete the Facility Owner section by providing the facility owner's name, address, city or town, state, and telephone number.
- Continue to fill out the General Contractor section, including their name, address, city or town, state, and telephone number.
- Provide details about the general construction or demolition contractor, including their name, address, city or town, and telephone number.
- Fill out the Licensed Contractor Supervisor section by including their name and license number.
- Specify if the entire facility is to be demolished and describe the area(s) that will be demolished.
- If applicable, describe the structures to be constructed or renovated and indicate whether they were surveyed for the presence of Asbestos-Containing Material.
- State whether asbestos containing material was found, and provide the name of the individual or organization that conducted the survey.
- Complete the project details, including its start and end dates, and document the dust suppression techniques that will be used.
- If applicable, provide information about emergency demolition operations, including the name and title of the MassDEP official who evaluated the emergency.
- Finally, review the certification section, ensuring you print your name, provide an authorized signature, your position/title, and the date of submission.
- Once all fields are correctly filled out, save the completed form. You can then download, print, or share the document as needed.
Complete your BWP AQ 06 form online today to ensure compliance and facilitate your construction or demolition project.
Section 201 of the building code indicates that permits are not needed for ordinary repairs that can be defined as “any maintenance which does not affect the structure, egress, fire protection systems, fire ratings, energy conservation provisions, plumbing, sanitary, gas, electrical, or other utilities.” This includes ...
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
        - 
                    In businnes since 199725+ years providing professional legal documents.
- 
                    Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
- 
                    Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.