Loading
Get Oil And Gas Pipeline
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the OIL AND GAS PIPELINE online
This guide provides a comprehensive overview of how to complete the OIL AND GAS PIPELINE declaration schedule online. It includes step-by-step instructions tailored to assist all users, including those with limited legal experience.
Follow the steps to complete the OIL AND GAS PIPELINE declaration schedule online.
- Press the ‘Get Form’ button to access the form and open it in your editor.
- Begin with section A. Name and address: If there are any discrepancies, correct the preprinted name and address. If a new owner is to be listed, include their information and the date of ownership transfer.
- For section B, property location: Provide the legal description of the pipeline system, including county name, section, range, township, and quarter section.
- In section C, listing of real property improvements: Document the location, description of the improvements, any additions, the date they were installed, and their original installed cost.
- Move to section D, listing of all pipeline personal property: Identify all pipeline equipment using item number, description, year acquired, and original installed cost. Include details such as length, type of material, diameter, rated capacity, actual capacity, condition, and any associated meters and equipment.
- In section E, listing of all non-licensed facility personal property: Provide the requested item number, description, location, year acquired, and original installed cost.
- For section F, listing of all leased equipment: Supply the description of the equipment, lessor's name and address, location, horsepower, lease term, and annual rent.
- Finally, complete section G, declaration and signature: Print the personal property owner's FEIN or SSN, the owner's name, and the name of the person signing. Include their phone number and email address, then sign and date the form.
- Once all sections are filled out, submit the form to the county assessor by the April 15 deadline. Ensure you keep a copy for your records.
Complete your OIL AND GAS PIPELINE declaration schedule online today!
The nation's more than 2.6 million miles of pipelines safely deliver trillions of cubic feet of natural gas and hundreds of billions of ton/miles of liquid petroleum products each year. They are essential: the volumes of energy products they move are well beyond the capacity of other forms of transportation.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.