Loading
             
                Get Building Permit Application - Updated May 2012 - City Of Paso Robles
How it works
- 
                    Open form follow the instructions
- 
                    Easily sign the form with your finger
- 
                    Send filled & signed form or save
How to fill out the Building Permit Application - Updated May 2012 - City Of Paso Robles online
Filling out the Building Permit Application accurately is vital for a timely permit process. This guide provides comprehensive instructions to assist you in successfully completing the form online.
Follow the steps to complete your building permit application online.
- Click ‘Get Form’ button to access the application and open it in the editor.
- Begin by providing the project address, including the lot and tract numbers. Ensure all fields are filled out accurately.
- Input the owner's details, including name, phone number, address, and email. This information is crucial for contact purposes.
- If there is a tenant involved, fill out their details in the designated section, including phone number, address, and email.
- Complete the agent for owner section, if applicable. Include their contact information to ensure seamless communication related to the project.
- Provide the architect or draftsman’s details, ensuring to include all requested contact information.
- Fill in the contractor's information accurately, including their license number, license class, and expiration date.
- Give a detailed description of the project, including the scope of work, value of the project, and permit types requested.
- Fill out building specifics such as total square footage, number of stories, bedrooms, bathrooms, occupancy group, and construction type.
- Complete the construction materials section, indicating the types of materials to be used for different components.
- In the utilities section, specify the type of water heating, HVAC size and type, and sewerage disposal method.
- Provide retaining wall information, if applicable, including length, height, and material.
- Answer the industrial waste question, providing details if your project involves wastewater discharge beyond standard fixtures.
- Once all sections are completed, review your entries for accuracy. After verification, you can save the changes, download, print, or share the application.
Complete your building permit application online today for a smoother permit experience.
Projects that DO NOT need a building permit are simple surface (cosmetic) projects; minor repairs and replacements; and minor site improvements or small structures.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
        - 
                    In businnes since 199725+ years providing professional legal documents.
- 
                    Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
- 
                    Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.