How to fill out the ZA Nelson Mandela Bay Municipality Small Scale Embedded Generation (SSEG) Application Form online
This guide provides step-by-step instructions on how to complete the ZA Nelson Mandela Bay Municipality Small Scale Embedded Generation (SSEG) Application Form online. Whether you are a homeowner or a business, this process will help you ensure your application is filled out correctly and fully.
Follow the steps to complete your application seamlessly.
- Click ‘Get Form’ button to access the application form and launch it in the online editor.
- Enter the erf number and account number in the appropriate fields. This information is essential for identifying your property and account details.
- Fill in the name of the account holder as it appears on the utility bill or property documents.
- Provide the project’s physical address where the embedded generation system will be installed.
- Input the existing meter number that is currently installed at the property.
- Select the type of application. Options include 'Domestic' and 'Business' depending on the nature of your project.
- Specify the energy source for your embedded generation, such as wind, photovoltaic (PV), or biogas.
- Indicate the type of use for the generated electricity, with options like self-consumption, wheeling, net billing, off grid, or PV geyser.
- If applicable, enter the model and size of the PV geyser.
- Specify the details of any energy storage technology and its size if you intend to install it.
- Select the type of smart meter that will be installed, choosing between prepaid or credit options.
- Input the applicant's contact number(s) and email address for follow-up communications.
- Provide the GPS coordinates for the project location in decimal degrees format.
- Detail the total capacity of the embedded generation system, stating the kVA and power factor.
- Specify the make and model of the generating/converter unit for the installation.
- Enter details for the main circuit breaker and the installer, including their contact information.
- Ensure that a Certificate of Compliance (CoC) will be submitted upon completion of installation, along with necessary sign-offs if the system exceeds 30 kW.
- Review the application thoroughly to ensure all fields are completed accurately. Approval will not be granted if the application is incomplete.
- Agree to the Renewable Energy Guideline of the Nelson Mandela Bay Municipality by indicating consent.
- Once all information has been filled out and double-checked, save changes, and download, print, or share the completed form as necessary.
Start filling out your application online to ensure a smooth and efficient process.
What is a Small Scale Embedded Generator (SSEG)? Electrical generators that can connect and operate in parallel with the grid/network (by synchronising with the grid), are seen as embedded generators (EG). EG smaller than 1MVA (1000kVA) are defined as small scale embedded generators.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.