Loading
Form preview picture

Get Audit Of The Western Area Power Administration's Contract With Basin Electric Power Cooperative

Ower Cooperative" BACKGROUND: At the request of the Western Area Power Administration (Western), we conducted an audit of charges to Western made by Basin Electric Power Cooperative (Basin), under Contract No. DEMP65-82WP-19001. The contract for Westernms purchase of electric power from Basin was entered into on April 15, 1982, and was in effect from January 1, 1986, through October 31, 1990. Western identified 17 areas where overcharges might have occurred. The purpose of the audit was to dete.

How It Works

cfr rating
4.8Satisfied
25 votes

Tips on how to fill out, edit and sign 20-year online

How to fill out and sign Synfuels online?

Get your online template and fill it in using progressive features. Enjoy smart fillable fields and interactivity. Follow the simple instructions below:

The prep of lawful paperwork can be high-priced and time-ingesting. However, with our preconfigured web templates, things get simpler. Now, using a Audit Of The Western Area Power Administration's Contract With Basin Electric Power Cooperative requires no more than 5 minutes. Our state online blanks and clear guidelines eliminate human-prone mistakes.

Follow our easy steps to have your Audit Of The Western Area Power Administration's Contract With Basin Electric Power Cooperative prepared rapidly:

  1. Pick the web sample from the catalogue.
  2. Complete all required information in the necessary fillable areas. The user-friendly drag&drop user interface allows you to add or move fields.
  3. Check if everything is filled out correctly, with no typos or missing blocks.
  4. Place your electronic signature to the page.
  5. Click Done to save the adjustments.
  6. Save the data file or print your PDF version.
  7. Submit immediately to the recipient.

Take advantage of the quick search and advanced cloud editor to produce a precise Audit Of The Western Area Power Administration's Contract With Basin Electric Power Cooperative. Clear away the routine and create papers online!

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

58-month FAQ

Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

Keywords relevant to Audit Of The Western Area Power Administration's Contract With Basin Electric Power Cooperative

  • MW
  • ANG
  • cfr
  • DGC
  • IG-0409
  • amortizations
  • 58-month
  • lignite
  • 20-year
  • offsetting
  • allocable
  • synfuels
  • allowability
  • recalculation
  • laramie
If you believe that this page should be taken down, please follow our DMCA take down processhere.
Ensure the security of your data and transactions

USLegal fulfills industry-leading security and compliance standards.

  • 
                            VeriSign logo picture

    VeriSign secured

    #1 Internet-trusted security seal. Ensures that a website is free of malware attacks.

  • Accredited Business

    Guarantees that a business meets BBB accreditation standards in the US and Canada.

  • 
                            TopTenReviews logo picture

    TopTen Reviews

    Highest customer reviews on one of the most highly-trusted product review platforms.