Speed: Max Water Allowed in Mix: Plant Location: gal. lbs. Plant Inspector: Materials Total Weight Tolerance - Fly Ash, lbs. Silica Fume, lbs Low + Cement, lbs. Total Wgt Range High Actual Batch Weights Batch 1 Batch 2 Sum Meets Range % Yes % Yes % Yes Total Cem. Matl Total lbs. Water in Load Yes Aggregate (1), lbs. Aggregate (2), lbs. Aggregate (3), lbs. Free Moisture % % Yes % % Yes % % Yes % SSD Weight Fre.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the SC DoT Form 700.04 online

The SC DoT Form 700.04, also known as the ready mix concrete report, is an essential document for tracking the details of concrete mixing and delivery. This guide will help you navigate the process of completing this form online with clear and step-by-step instructions.

Follow the steps to complete the SC DoT Form 700.04.

  1. Click the ‘Get Form’ button to obtain the form and open it in the editing interface.
  2. Begin by entering the unique ID, status, date, file number, and load number at the top of the form. These identifiers are crucial for tracking your specific concrete load.
  3. Fill in the class of concrete being mixed, along with the date and time mixing began. Specify the cubic yards of concrete being produced.
  4. Document the cumulative cubic yards and include the project number and truck number associated with the delivery.
  5. Input the revolutions at plant mixing speed and the maximum water allowed in the mix, measured in gallons and pounds.
  6. Complete the plant location section and the materials part. Input the total weight along with the tolerance for fly ash, silica fume, and cement.
  7. Document the actual batch weights for each batch (Batch 1, Batch 2), and ensure they meet the specified weight range.
  8. Fill in the total weights for water, aggregate materials, and other relevant additions like air entraining agents or water reducers.
  9. Calculate the water/cementitious material ratio and ensure that this section is clearly filled out as it is a critical factor in concrete quality.
  10. Record the date and time the truck finished unloading, along with slump and entrained air measurements at placement.
  11. Finalize the form by ensuring all sections are complete. You can then save changes, download, print, or share the completed form as necessary.

Complete your SC DoT Form 700.04 online today to ensure accurate and efficient documentation.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

Copy of Technician Certification Policy...

Must have thorough understanding of and experience with filling out the SCDOT 700.04 form...

Learn more
scdot concrete technician certification manual...

SCDOT Concrete Technician Certification Class Schedule ... Guidelines for Completing the...

Learn more
TAB-How-to-Troubleshoot-&-repair-Electronic-Circuits...

Aug 20, 2020 — In this book you will find selected electronic circuits, ways to...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get SC DoT Form 700.04