The CA LADBS GRN 15 form is an essential document for compliance with the Los Angeles Green Building Code, specifically designed for non-residential buildings. This guide provides a step-by-step approach to help you accurately complete the form online, ensuring you meet all necessary requirements.
Follow the steps to successfully complete the CA LADBS GRN 15 form online.
- Press the ‘Get Form’ button to access the form and open it in your preferred online editor.
- Clearly state on the plans that the outdoor lighting systems will comply with the minimum requirements in the California Energy Code for Lighting Zones 1-4, including Backlight, Uplight and Glare (BUG) ratings.
- Indicate that separate submeters will be installed for any space projected to consume more than 1,000 gallons per day.
- Confirm that new plumbing fixtures will adhere to the maximum allowable flow rate specified in the relevant section of the code.
- For shower installations, ensure that the combined flow rate of all showerheads does not exceed 2.0 gallons per minute or that it allows operation for only one showerhead at a time.
- If landscape work is included, note that the Landscape Certification, Form GRN 12, must be completed prior to final inspection approval.
- Document that installed automatic irrigation controllers are weather- or soil-based.
- List the compliance of weather-resistant exterior wall and foundation envelope with the relevant sections of the Los Angeles Building Code and California Energy Code.
- Ensure automatic landscape irrigators are positioned to prevent sprays on the structure.
- Specify that new exterior entries are protected against water intrusion using appropriate architectural features.
- State that nonabsorbent floor and wall finishes will be used around new exterior entries subject to foot traffic.
- Confirm compliance of all architectural paints, coatings, adhesives, caulks, and sealants with VOC limits as outlined.
- Complete and verify the VOC Content Verification Checklist, Form GRN 2, and ensure specifications are available at the site.
- Ensure that new carpets installed meet safety and product requirements as outlined.
- Validate that new wood products meet formaldehyde limits by completing the Formaldehyde Emissions Verification Checklist, Form GRN 3.
- Address the installation of resilient flooring to meet specific VOC emission limits.
- Confirm the use of a City of Los Angeles certified hauler for construction waste.
- Detail the requirements for air filters in mechanically ventilated buildings.
- Elaborate on the recycling or reuse of excavated soil and vegetation resulting from land clearing.
- State the requirements for designated outdoor smoking areas relative to air intakes.
- Provide a final report for the testing and adjusting of all new systems to the field inspector prior to final approval.
- Ensure all new equipment has an Operation & Systems Manual available for final inspection.
- Summarize compliance with ventilation and structural provisions of the California Building Code.
- Once you have filled out all required information, save your changes, and choose to download, print, or share the completed form as needed.
Complete your CA LADBS GRN 15 form online today to ensure compliance with the Los Angeles Green Building Code.
Example of green building codes: The standard addresses site sustainability, water use efficiency, energy use efficiency, indoor environmental quality, and the impact on the atmosphere, materials, and resources by buildings, as well as high-performance operation.