Roject and at least 260 linear feet or 160 square feet or 35 cubic feet of RACM is to be removed. It is a demolition project with or without asbestos-containing material (ACM). A structure is going to be burned for fire training (requires Departmental approval). WHAT IS REGULATED ASBESTOS-CONTAINING MATERIAL? RACM has greater than 1% asbestos by weight and includes friable and nonfriable forms. (“Friable” means that it can be crushed to powder by hand pressure.) RACM can include: (1) Friabl.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the AL ADEM Form 496 online

The AL ADEM Form 496 is essential for notifying the Alabama Department of Environmental Management about asbestos abatement or demolition activities. This guide provides step-by-step instructions for completing the form online, ensuring accuracy and compliance with critical regulations.

Follow the steps to successfully complete the AL ADEM Form 496 online.

  1. Click the ‘Get Form’ button to access the AL ADEM Form 496 and open it in your preferred online editor.
  2. Begin by entering the facility name in the designated field followed by the facility physical address, including city, state (AL), zip code, and county information.
  3. Provide the on-site contact person's name, title, and phone number. Fill in the building description, including size, age, number of floors, and prior usage.
  4. Specify the exact removal site by detailing rooms, floors, or building numbers where abatement will take place.
  5. Complete the facility owner section by entering the owner's name, address, city, state, zip code, contact person's name, title, phone number, and email.
  6. Fill out the asbestos inspector's name and employer, along with their phone number and email address. Also, provide the safe state accreditation number and inspection date.
  7. Record the abatement contractor's name and ADEM certification number, along with their address, city, state, zip code, contact name, phone number, and email.
  8. If applicable, enter the demolition contractor's information in the corresponding fields, following the same format as for the abatement contractor.
  9. Choose whether the project involves renovation, demolition, or indicates that there is no asbestos present. Accurately complete the abatement and demolition start and finish dates.
  10. Outline work days and hours, and provide any emergency reasons for not complying with the 10-day notification requirement.
  11. Attach a list detailing the amounts and types of asbestos-containing material to be abated, indicating whether the material is friable or non-friable, and specify the removal methods.
  12. Enter the waste disposal site information, including contact details and the permit number.
  13. Describe the procedures in place for managing unexpected asbestos-containing materials.
  14. Certify the accuracy of the information provided by adding your signature, print name, and phone number, along with the date.

Start filling out the AL ADEM Form 496 online today to ensure your compliance with asbestos regulations.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

ADEM Form 496 Notice of Asbestos Abatement and/or...

The Notice of Asbestos Abatement and/or Demolition is available through ADEM's Alabama...

Learn more
Ala. Admin. Code r. 335-1-1-.01 | State...

Ala. Admin. Code r. 335-1-1-.01 - Departmental Forms, Instructions, And Procedures ;...

Learn more
EPA

As required by the Water Resources Development Act of 1992 (WRDA), I am pleased to...

Learn more
Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get AL ADEM Form 496