Loading
Get Notification Of Connection Completion And Meter Bb - Affinity Water
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Notification Of Connection Completion And Meter Bb - Affinity Water online
This guide provides clear, step-by-step instructions on how to complete the Notification Of Connection Completion And Meter Bb form for Affinity Water. It is designed to assist users in accurately filling out the necessary sections of the form online.
Follow the steps to successfully complete your form.
- Press the ‘Get Form’ button to obtain the form and access the editing interface.
- Begin by filling out Section A, which requires the Self Lay Organisation (SLO) details. Include the company name, address, contact name, position, telephone number, mobile number, and email address for the principal contact responsible for coordinating on-site construction works.
- Move to Section B to provide Developer details. Populate this section with the company name, address, contact name, position, telephone number, mobile number, and email address of the principal contact for the Developer.
- In Section C, provide information about the site details. This includes the scheme reference, site name, site address, and the current construction phase of the project.
- Proceed to Section D where you need to fill in Connection and Meter Details. Record the date of installation, plot number, meter serial number, and meter size (options include 15mm, 25mm, 40mm, 50mm, or 80mm), along with the meter reading, postal address, and meter location.
- Finally, complete Section E, which is the Checklist and Declaration. Confirm that you understand the conditions by ticking the box and signing the form. Ensure you print your name, company, job title, and date. Remember that the form cannot be accepted without a signature.
- After filling out all sections, review your entries for accuracy. If everything is correct, save your changes, and proceed to download, print, or share the completed form as necessary.
Complete your Notification Of Connection Completion And Meter Bb form online today.
Water Connection means the point where a water service line attaches to a water main, thereby allowing water to flow from the City's water system to an individual customer.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.