Loading
Get Fertigstellungsanzeige
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Fertigstellungsanzeige online
The Fertigstellungsanzeige is a necessary document in the construction process that confirms the completion of a project according to applicable regulations. This guide provides a clear, step-by-step approach to filling out this form online, making the process accessible for all users.
Follow the steps to successfully complete the Fertigstellungsanzeige online.
- Use the ‘Get Form’ button to access the Fertigstellungsanzeige form and open it in your preferred online editor.
- Begin by entering the location of the project in the designated space, ensuring all details are accurate.
- Fill out the information regarding the construction project under the 'Bauvorhaben' section, including the address and the name of the applicant.
- Provide the original approval reference number in the 'Geschäftszahl der ursprünglichen Baubewilligung' field.
- In the 'Pflichtstellplätze' section, indicate the number of required parking spaces and their locations as applicable.
- Confirm the completeness of the submission documents and check the appropriate box for the execution plans, based on the project's conformity to the approved plan.
- For the 'Überprüfungsbefunde' section, specify whether a testing engineer was required, and attach relevant verification documents if applicable.
- In the 'Zuverlässigkeit der Tragwerke' section, provide the necessary details regarding structural reliability and include any relevant positive assessments.
- Complete the sections on safety features and building measures to prevent emissions as needed.
- Finalize by reviewing all entered information for accuracy, then save your changes, download the completed form, and prepare to print or share as necessary.
Complete your Fertigstellungsanzeige online for a smooth submission process.
Related links form
Die Fertigstellungsanzeige nach VOB wird durch den Auftragnehmer, das bauausführende Unternehmen, erstellt. Ob der Bauleiter oder ein beteiligtes Teammitglied dieses Dokument aufsetzen ist grundsätzlich egal.