Hoisting and Rigging Plan Location: Load Description: Lift Director Ordinary: Critical: Date of Lift: Multiple Cranes: NOTE: If lift requires multiple cranes, a lift plan for each crane must be filled.

How it works

  1. Open form

    Open form follow the instructions

  2. Easily sign form

    Easily sign the form with your finger

  3. Share form

    Send filled & signed form or save

How to fill out the Contractor Pre-Job Checklist online

Completing the Contractor Pre-Job Checklist is essential for ensuring safety and compliance before any lifting operation. This guide provides detailed, step-by-step instructions to help users accurately fill out the checklist online, improving workflow and efficiency.

Follow the steps to complete the checklist effectively.

  1. Press the ‘Get Form’ button to access the Contractor Pre-Job Checklist and open it in your preferred editing platform.
  2. Begin with entering the location of the lift, followed by a brief load description. Specify the name of the lift director responsible for overseeing the operation.
  3. Indicate the date of the lift and check if multiple cranes will be used for the operation. If multiple cranes are indicated, remember that a separate plan must be completed for each crane.
  4. In section A, select the type of crane being used and provide its capacity in tons. Record the lifting arrangement details, including radius measurements at both pick-up and set-down locations, boom length, boom angles, and rated capacities from the specifications chart.
  5. Proceed to section D focused on rigging. Here, list the number of slings, their types, sizes, lengths, and their capacity ratings. Confirm if softeners are required for the lift.
  6. In section B for jib specifics, mark whether the jib is erected or stowed, record the jib's length, and note the rated capacity based on the chart provided.
  7. Section C requires details about the hoist rope, including diameter and the number of parts, and its rated capacity.
  8. For crane placement in section D, confirm whether the crane is properly positioned and safe for operation.
  9. Section E focuses on the intended lift load. Enter weights for the load, auxiliary block, main block, lifting beam, slings/shackles, jib/extension, hoist rope, and any excess load material.
  10. Finally, ensure to fill out the pre-lift checklist with pertinent information, including the verification of the qualified crane operator, riggers, and any potential hazards present in the area.
  11. After completing the form, save your changes, and choose to download, print, or share the checklist online with relevant parties.

Complete your Contractor Pre-Job Checklist online today to enhance safety and compliance.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.
Get form

Related content

PRE-CONSTRUCTION CHECKLIST - gov.energy.eere.www1
Burn Permit approval requirements. OSHA health cards up-to-date as required by site...
Learn more
Contractor Pre-Job Safety Review Checklist
Have the requirements for Hazard Communication including contractor SDSs, been reviewed?...
Learn more
Construction Manual Appendix - City of Oakland
Jul 10, 2019 — improvements in order to make the job complete. ... PRE-CONSTRUCTION...
Learn more

Related links form

Your HIPAA Privacy Rights: FAQs The Ideal Exit Internal Benchmarking: Use Past Performance To Boost Future Profit Anyone Can Manage During Good Times

Questions & Answers

Get answers to your most pressing questions about US Legal Forms API.

Contact support

The Pre-Work Phase identifies and evaluates hazards. It asks what controls, roles, and responsibilities can be used to assess and manage risk.

Persistent scatterer interferometry (PSI) represents a powerful tool to measure mining subsidence, as it offers a synoptic view that can be repeated at different time intervals and at various scales.

A pre-site safety inspection (PSI) is an examination of a site before the project work begins. It includes the general observation of the overall conditions of the area, appraisal of compliance, interviewing personnel and examining the operability of specific works.

Must-Haves The contractor has online ratings. As with any job, you want someone who is experienced and does quality work. ... They're licensed to operate in your area. ... You're given a written estimate. ... They're timely and attentive. ... They communicate clearly. ... You're pressured to make a quick decision. ... There's no contract.

A construction checklist is a document used to identify potential risks associated with job tasks, perform regular tools and equipment checks, and implement safety measures and protocols for employees to adhere to and comply with to prevent injuries and workplace deaths.

Physical, chemical, and toxicological information related to the chemicals, process, and equipment. It is used to document the configuration of a process, its characteristics, its limitations, and as data for process hazard analyses.

Definition. Safe work practices are generally written methods outlining how to perform a task with minimum risk to people, equipment, materials, environment, and processes. Safe job procedures are a series of specific steps that guide a worker through a task from start to finish in a chronological order.

How to Choose the Best Contractor for the Job Obtain multiple bids. ... Consider the needs of your specific project. ... Take note of their communication style. ... Consider their availability. ... Check to make sure the contractor is licensed and insured. ... Meet their team and subcontractors. ... Check reviews and references.

Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.
Get form
If you believe that this page should be taken down, please follow our DMCA take down processhere.

Industry-leading security and compliance

US Legal Forms protects your data by complying with industry-specific security standards.
  • In businnes since 1997
    25+ years providing professional legal documents.
  • Accredited business
    Guarantees that a business meets BBB accreditation standards in the US and Canada.
  • Secured by Braintree
    Validated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.
Get Contractor Pre-Job Checklist
Get form
Form Packages
Adoption
Bankruptcy
Contractors
Divorce
Home Sales
Employment
Identity Theft
Incorporation
Landlord Tenant
Living Trust
Name Change
Personal Planning
Small Business
Wills & Estates
Packages A-Z
Form Categories
Affidavits
Bankruptcy
Bill of Sale
Corporate - LLC
Divorce
Employment
Identity Theft
Internet Technology
Landlord Tenant
Living Wills
Name Change
Power of Attorney
Real Estate
Small Estates
Wills
All Forms
Forms A-Z
Form Library
Customer Service
Terms of Service
Privacy Notice
Legal Hub
Content Takedown Policy
Bug Bounty Program
About Us
Help Portal
Legal Resources
Blog
Affiliates
Contact Us
Delete My Account
Site Map
Industries
Forms in Spanish
Localized Forms
State-specific Forms
Forms Kit
Legal Guides
Real Estate Handbook
All Guides
Prepared for You
Notarize
Incorporation services
Our Customers
For Consumers
For Small Business
For Attorneys
Our Sites
US Legal Forms
USLegal
FormsPass
pdfFiller
signNow
airSlate WorkFlow
DocHub
Instapage
Social Media
Call us now toll free:
+1 833 426 79 33
As seen in:
  • USA Today logo picture
  • CBC News logo picture
  • LA Times logo picture
  • The Washington Post logo picture
  • AP logo picture
  • Forbes logo picture
© Copyright 1997-2025
airSlate Legal Forms, Inc.
3720 Flowood Dr, Flowood, Mississippi 39232
Form Packages
Adoption
Bankruptcy
Contractors
Divorce
Home Sales
Employment
Identity Theft
Incorporation
Landlord Tenant
Living Trust
Name Change
Personal Planning
Small Business
Wills & Estates
Packages A-Z
Form Categories
Affidavits
Bankruptcy
Bill of Sale
Corporate - LLC
Divorce
Employment
Identity Theft
Internet Technology
Landlord Tenant
Living Wills
Name Change
Power of Attorney
Real Estate
Small Estates
Wills
All Forms
Forms A-Z
Form Library
Customer Service
Terms of Service
Privacy Notice
Legal Hub
Content Takedown Policy
Bug Bounty Program
About Us
Help Portal
Legal Resources
Blog
Affiliates
Contact Us
Delete My Account
Site Map
Industries
Forms in Spanish
Localized Forms
State-specific Forms
Forms Kit
Legal Guides
Real Estate Handbook
All Guides
Prepared for You
Notarize
Incorporation services
Our Customers
For Consumers
For Small Business
For Attorneys
Our Sites
US Legal Forms
USLegal
FormsPass
pdfFiller
signNow
airSlate WorkFlow
DocHub
Instapage
Social Media
Call us now toll free:
+1 833 426 79 33
As seen in:
  • USA Today logo picture
  • CBC News logo picture
  • LA Times logo picture
  • The Washington Post logo picture
  • AP logo picture
  • Forbes logo picture
© Copyright 1997-2025
airSlate Legal Forms, Inc.
3720 Flowood Dr, Flowood, Mississippi 39232