Loading
Get Installation Up Documentation For Nlight Network...
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Installation Up Documentation For NLight Network online
This guide provides step-by-step instructions for accurately completing the Installation Up Documentation for the NLight Network, ensuring a smooth installation process. By following these guidelines, users can effectively manage their documentation and meet project requirements.
Follow the steps to successfully complete the Installation Up Documentation.
- Press the ‘Get Form’ button to obtain the form and open it in your preferred online editor.
- Begin by entering required project information at the top of the form. Specify the job name, location, and requested startup date clearly to avoid any confusion during processing.
- Locate the serial numbers of the nGWY devices and place the removable Device ID stickers on the appropriate Gateway(s). Be sure to include IDs for all Gateways if multiple units are used.
- Verify the total number of devices reported by the Gateway on the LCD screen. Ensure this number matches the actual devices connected to confirm successful communication.
- Record the number of downstream Bridges connected to each Gateway and observe the blink codes on the Bridges for troubleshooting purposes.
- Confirm that all CAT-5A cables have been tested with a LAN cable tester and passed for optimal performance.
- Check that all powered devices in use display active LEDs. Troubleshoot any devices exhibiting communication errors as necessary.
- If applicable, verify the On/Off control functionality. Ensure basic controls operate as intended without requiring additional programming.
- If applicable, confirm manual dimming controls are functioning. All enabled fixtures should operate together initially.
- Ensure each Gateway has a valid Ethernet connection. A link icon should display on the touchscreen if connected properly.
- Fill out each section of the Project Installation Forms, ensuring that all project installation details, including Bridge Serial Numbers and device counts, are documented accurately.
- After completing all sections, save your changes, and consider downloading, printing, or sharing the form as required to maintain project records.
Complete the Installation Up Documentation online to ensure a successful NLight Network setup.
Related links form
Press button the number of times for the desired setting (i.e., press twice for 2.5 minutes Time Delay). LED will flash back this new setting, (repeated up to 10 times). Press button down again until LED flashes rapidly (approximately 6 seconds). Release button.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.