APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps online

Filling out the Approved Jurisdictional Determination Form is essential for determining the jurisdiction over waters within the United States. This guide will provide clear and structured steps to complete the form accurately, ensuring compliance with both the Rivers and Harbors Act and the Clean Water Act.

Follow the steps to effectively complete the form.

  1. Press the ‘Get Form’ button to access the form and open it in your preferred document editor. Ensure your platform supports online editing.
  2. Review Section I, which contains background information. Fill in the report completion date for the approved jurisdictional determination, district office details, and project location including state, county, city, and coordinates.
  3. In Section II, summarize findings. For the RHA section 10 determination of jurisdiction, check all relevant boxes to indicate the status of navigable waters within the review area.
  4. In Section II, address the CWA section 404 determination of jurisdiction by specifying the presence of waters of the U.S. Check all applicable boxes related to the types of waters identified.
  5. Complete Section III, providing detailed analyses for TNWs and wetlands adjacent to TNWs. Identify and summarize the findings supporting jurisdictional claims.
  6. Proceed to detail the characteristics of tributaries and adjacent wetlands, as outlined in Section III. Provide necessary physical, chemical, and biological characteristics along with any nexus considerations.
  7. Conclude with Section IV by listing the data sources that support your findings. This may include maps, reports, and any supporting documentation.
  8. Once all sections are completed, save the form, download it if needed, or print it for submission. Ensure all information is accurate before submitting.

Start completing your documents online today for efficient processing!

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

APPROVED JURISDICTIONAL DETERMINATION FORM U.S...

U.S. Army Corps of Engineers. This form should be completed by following the instructions...

Learn more
APPROVED JURISDICTIONAL DETERMINATION FORM U.S...

U.S. Army Corps of Engineers. This form ... A. REPORT COMPLETION DATE FOR APPROVED...

Learn more
MULTI-PHASE EXTRACTION - USACE Publications...

Jun 1, 1999 — This manual is approved for public release, distribution is unlimited...

Learn more
Questions & Answers

Get answers to your most pressing questions about US Legal Forms API.

Contact support

What is the mission of the US Army Corp of Engineers?

Deliver vital engineering solutions, in collaboration with our partners, to secure our Nation, energize our economy, and reduce disaster risk. Engineering solutions for our Nation's toughest challenges.

An "Approved JD" can be either issued as a a "Stand Alone Approved JD" or it can be associated with a permit action. A "Preliminary JD" is used to expedite the permitting process.

The Corps issues its decisions by way of both Preliminary Jurisdictional Determinations (“PJDs”), which are only advisory and not binding upon the agency, and Approved Jurisdictional Determinations (“AJDs”), which are final and can be relied upon for permitting purposes.

The United States Army Corps of Engineers (USACE) is an engineer formation of the United States Army that has three primary mission areas: Engineer Regiment, military construction, and civil works.

APPROVED JURISDICTIONAL DETERMINATION (AJD): A process used by the Corps to make a definitive, official determination whether aquatic resources in the review area are or are not jurisdictional (33 CFR 331.2). The only USACE process for determining that an aquatic resource is NOT jurisdictional is an AJD.

The Corps issues its decisions by way of both Preliminary Jurisdictional Determinations (“PJDs”), which are only advisory and not binding upon the agency, and Approved Jurisdictional Determinations (“AJDs”), which are final and can be relied upon for permitting purposes.

A jurisdictional determination is a decision by the Army Corps of Engineers as to whether areas on your property are regulated under federal statutes. A federally-regulated wetland, lake, pond or stream is called a "waters of the U.S."

The U.S. Army Corps of Engineers is responsible for protecting many of the nation's aquatic environments including oceans, rivers, lakes, streams, ponds, and wetlands. These areas are referred to by the Corps as waters of the United States.

Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps ...