Michigan Department Of Transportation 1161 (06/13) FOUNDATION PILING RECORD Attach pile layout sketch showing footing outline and numbering of piles. Identify test piles DISTRIBUTION: ORIGINAL Construction.

How it works
  • Open form

    Open form follow the instructions

  • Easily sign form

    Easily sign the form with your finger

  • Share form

    Send filled & signed form or save

How to fill out the Piling Record Form online

Filling out the Piling Record Form accurately is crucial for documenting foundation piling details. This guide provides step-by-step instructions to navigate the online form efficiently.

Follow the steps to complete the Piling Record Form online.

  1. Press the ‘Get Form’ button to access the form and open it in the editor.
  2. Begin by entering the contract ID into the designated field to ensure proper identification of the project.
  3. Fill in the project number in the appropriate section to link the piling activities to the wider project.
  4. Specify the crossing details as well as the structure number required for accurate records.
  5. Input the route information and the contractor's name to attribute the piling work correctly.
  6. Record the weight per foot and the energy per blow to provide essential specifications of the piles.
  7. Enter the weight of the ram, the date driven, and the pile number to track installation effectively.
  8. Note the number of blows per foot to assess the driving conditions and pile behavior.
  9. Indicate the type of pile used along with each pile's bearing capacity and splice length.
  10. Complete the fields for total cut-off driven length, count any splices, and confirm the acceptance of welded splices if applicable.
  11. Include the average depth and diameter of the pre-bore if relevant to the project.
  12. Lastly, fill in any remarks, and provide signatures for the inspector and construction engineer along with their respective dates.
  13. Finally, save your changes, and utilize the options to download, print, or share the completed form as needed.

Complete your documents online today to ensure efficient project management!

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.

Related content

PILE DRIVING RECORD SUMMARY

Bearing piles shall be given at least five blows after refusal (5 blows/0.25 in). Indicate...

Learn more
record keeping and inspection notes for future...

RECORD KEEPING AND. INSPECTION NOTES ... Definitions and Data table. – Test Piles. –...

Learn more
In-the-Wet Design and Construction of Civil ......

Sep 30, 2006 — It is also essential to monitor and record the elevation of tremie pipe...

Learn more
Questions & Answers

Get answers to your most pressing questions about US Legal Forms API.

Contact support

What is a pile driving template?

A fabricated guide used to align the piling before driving. Circular templates may have one or more rings against which piles are set to form the circle of the cell. This can be almost any shape; square, rectangular, etc.

Online Login to DDA portal (Zoning e-Services) Under the Building project, select Piling Inspection application. Complete the application. Upload the required documents. Submit the application.

A pile of logs simulates fallen trees and is considered essential in a wildlife garden. You can usually find somewhere to put a pile of logs, even in the smallest backyard. It is best placed in a shady spot, so that it remains cool and damp.

Following are the Indian Standard Codes on Pile Foundations: IS 2911 : Part 1 : Sec 1 : 1979 Driven cast in-situ concrete piles. IS 2911 : Part 1 : Sec 2 : 1979 Bored cast-in-situ piles. IS 2911 : Part 1 : Sec 3 : 1979 Driven precast concrete pile.

Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.

If you believe that this page should be taken down, please follow our DMCA take down process here.

Get Piling Record Form