How to fill out the Application Building Permit City Of Everett Massachusetts online
This guide provides a comprehensive overview of how to complete the Application Building Permit form for the City of Everett, Massachusetts, online. By following these detailed steps, users will be able to navigate each section of the application with confidence.
Follow the steps to easily complete your application online.
- Click ‘Get Form’ button to obtain the form and open it in your preferred editor.
- Begin filling out Section 1: Site Information. Provide the property address, assessors map and parcel number, zoning information, property dimensions, building setbacks, water supply, flood zone information, and sewage disposal system information.
- In Section 2: Property Ownership/Authorized Agent, fill in the name and address of the owner of record as well as their signature and phone number. If applicable, provide similar details for the authorized agent.
- For Section 3, indicate if the project requires licensed holder information. Complete this section if the project falls under the threshold for cubic feet of enclosed space.
- In Section 4, ensure you complete the Workers Compensation Insurance Affidavit. This affidavit is essential; failure to submit it can lead to denial of your permit.
- Proceed to Section 5: Professional Design and Construction Services. Fill out details of registered architects and engineers as necessary, indicating if not applicable.
- In Section 6: Description of Proposed Work, check all that apply regarding the type of construction, and provide a brief description of the proposed work.
- For Section 7, select the appropriate use group and construction type corresponding to your project.
- Complete Section 8 regarding building height and area, indicating the number of floors and total area.
- Check if a structural peer review is required in Section 9.
- Complete Section 10A if an agent or contractor is applying on behalf of the owner, including the owner's signature.
- In Section 10B, the owner or authorized agent must declare that the information is true, providing their printed name and signature.
- Finally, complete Section 11: Estimated Construction Costs by filling in the estimated costs for each relevant item to finalize your application.
- Once all sections are complete, save your changes, and utilize the options to download, print, or share the form as necessary.
Complete your Application Building Permit online today to ensure a timely processing of your request.
Many permits can be issued in a matter of days or sometime hours. The time it takes to issue a permit depends on many factors. The complexity of the construction project may require many days or even weeks for Building Department review. A construction project may be subject to local zoning requirements.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.