Loading
Get Cii Controlled Inspections Special Inspection Report (firestop,
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the CII Controlled Inspections SPECIAL INSPECTION REPORT (Firestop) online
This guide provides a clear and supportive approach to completing the CII Controlled Inspections Special Inspection Report for Firestop, ensuring your submission is efficient and comprehensive. Adhering to these steps will help users navigate the requirements and fill out the form correctly.
Follow the steps to complete the report accurately.
- Click ‘Get Form’ button to access the form and open it in your preferred online editor.
- Enter the date of the inspection in the provided field to ensure accurate record-keeping.
- Fill in the TCA number, which is essential for tracking the inspection details.
- Select the shift for the inspection—either day or night—by marking the appropriate box.
- Input the CTG project number, which will help in identifying the specific project related to the inspection.
- Provide the client’s name and ensure that all project information, such as project name and location, is accurately entered.
- Complete the sections regarding the construction manager and contractor, ensuring that these roles are correctly listed.
- Record the weather conditions and temperature at the time of inspection, which may impact the findings.
- Next, enter the inspector's name, along with the time you entered and exited the inspected area.
- Indicate whether there was a same-day cancellation by marking 'Yes' or 'No' in the designated box.
- Provide code references and any relevant documents reviewed during the inspection to substantiate your findings.
- List the methods of evaluation, such as visual inspection, based on your expertise and the requirements.
- In the 'Location(s) inspected & findings' section, detail any specific locations and the results of the inspection.
- Fill out the contractor's trade, floor location, description of work, materials used, and acceptance status for each inspected area.
- Make any necessary remarks regarding the inspection process, deviations, or follow-up requirements.
- Finally, ensure that your signature and printed name are included in the appropriate fields before submitting the report.
Complete the CII Controlled Inspections Special Inspection Report online today for a streamlined documentation process.
A bundle consists of 1,000 notes of the same denomination in ten equal straps of 100 notes each. Before depositing currency, currency must be prepared ing to denomination.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.