Loading
Get Generator Log
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Generator Log online
Filling out the Generator Log is essential for tracking the inspection and operation of emergency and auxiliary generators. This guide provides comprehensive, step-by-step instructions to assist users in accurately completing the form online.
Follow the steps to effectively complete the Generator Log
- Click 'Get Form' button to access the Generator Log and open it in your preferred online editor.
- Begin with the engine data section. Fill in the make, model, serial number, RPM, and hour meter readings. Start by noting down the initial time when the engine is started, and conclude with the finish time after use.
- Complete the voltage regulator section. Document make, model, and serial number, along with any remarks regarding the condition of the regulator mounts and rheostat.
- Move to the alternator data. Provide details about the make, model, serial number, KW rating, volts, and phase. Check for any wiring damage or overheating of components.
- In the cooling system section, record temperatures during standby and operations, coolant added, antifreeze protection, and the condition of the fan belt and radiator.
- Fill out the lube oil system information. Indicate if oil was changed, cleanliness, oil condition, and any issues related to exhaust, engine vibration, and loose items.
- For the fuel system, detail the fuel levels in both the day and storage tanks, record any water drained, and note any fuel leaks.
- Document the battery bank status, including connections, cleanliness, and hydrometer reading.
- Complete the sections for starting air, ambient temperature, and filter changes. Indicate whether the unit started on the first, second, third try, or not at all.
- Finally, ensure to add any additional comments or corrective actions if necessary, using the back of the form or additional paper if required.
- Once all fields are filled, review your entries for accuracy. Save changes, and download, print, or share the Generator Log as needed.
Start filling out your Generator Log online today to ensure your generator is accurately monitored and maintained.
A load bank test ensures that your generator will run when needed so that you can count on it producing power during any kind of emergency that may arise. A proper load bank test will give you an evaluation of your generator at its full kilowatt output rating.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.