Loading
Get Ss-182a Application For A Permit To Install Or Modify An Onsite Sewage Disposal System
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the SS-182A Application For A Permit To Install Or Modify An Onsite Sewage Disposal System online
Filling out the SS-182A Application for a Permit to Install or Modify an Onsite Sewage Disposal System is an essential step for property owners planning to install or modify their sewage systems. This guide provides a comprehensive and clear approach to completing the form online, ensuring that users can confidently submit their applications.
Follow the steps to successfully complete the application online.
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Begin by filling out the property owner section. Provide your name, home phone number, address, city, state, and zip code. Ensure all information is accurate, as it will be used for communication regarding your application.
- Next, input the property location details, including whether the property has ever been denied a permit, the type of facility (new or existing), and the lot size in acres or square feet.
- Specify the water source and the number of bedrooms and individuals served by the sewage system. Additionally, note if the deed is recorded and provide the deed book and page number.
- Complete the design daily flow section with the appropriate gallons per day (gpd) and attach details on the county tax map, subdivision name, and approval number if applicable.
- Certify the information provided by signing and dating the application. Acknowledge your responsibility for informing the installer of existing or proposed systems and consulting a sanitarian as needed.
- Fill out the sewage disposal system information section, indicating whether the application is for installation or modification. Check all applicable options related to the sewage system components you are using.
- Conduct percolation tests if required, noting the results for each test hole. Document the average time for water to fall one inch, ensuring that the test complies with the outlined standards.
- Provide details about the septic tank, such as its capacity, material, manufacturer, and whether an outlet filter is used. Include specifications for the drain field, absorption field, and effluent distribution.
- Draw a sketch of the property, displaying the location of existing or proposed well locations, structures, and the sewage system layout.
- Finally, ensure that the certified installer enters their contact information, certification number, and signature. After reviewing all entered information, users can save changes, download, print, or share the completed form.
Complete your SS-182A application online today to ensure a smooth process for obtaining your permit.
Bringing invoice and pricing data into invoice templates may seem streamlined and secure, but if these are then sent out in the body of an email, or as an attachment (such as an unsigned PDF), there's a risk of interception and malicious reworking to redirect payments elsewhere.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.