Loading
             
                Get Net Metering And Interconnection Agreement - Lehi City - Lehi-ut
How it works
- 
                    Open form follow the instructions
- 
                    Easily sign the form with your finger
- 
                    Send filled & signed form or save
How to fill out the NET METERING AND INTERCONNECTION AGREEMENT - Lehi City - Lehi-ut online
This guide provides a comprehensive, user-friendly approach to filling out the NET METERING AND INTERCONNECTION AGREEMENT for Lehi City. By following the steps outlined, you will be able to complete the form with confidence and clarity.
Follow the steps to successfully complete the NET METERING AND INTERCONNECTION AGREEMENT.
- Click the ‘Get Form’ button to access the NET METERING AND INTERCONNECTION AGREEMENT and open it in an editable format.
- Begin by filling out Section 1: Customer Information. Here, you will need to provide your name, utility customer account number, mailing address, physical address if different, daytime and evening phone numbers, and email address.
- Proceed to Section 2: Net Metering Facility Information. Indicate the system type (Solar in this case), specify the generator size in kW AC, and provide details on the inverter manufacturer, model, serial number, and power rating, along with the inverter location.
- In Section 3: Installation Information, list the name of the licensed electrician and their contractor number. Additionally, provide the mailing address and contact numbers for the electrician.
- Move to Section 4: Certifications. You will need to have the equipment vendor sign and date the section confirming that the inverter meets necessary standards. Then, the Facility owner must also sign indicating satisfaction with the installation and receipt of related documentation.
- Fill in the stipulated start-up date for the Facility operation. Make sure all entries are accurate and completed.
- Review the entire agreement for completeness and accuracy. Make any necessary corrections before submitting the form.
- Once you have completed the form, you can save your changes, download a copy for your records, print it for submission, or share it with relevant parties as needed.
Complete your NET METERING AND INTERCONNECTION AGREEMENT online today!
Electricity interconnectors are high-voltage cables that connect the electricity systems of neighbouring countries. They enable excess power, such as that generated from wind and solar farms, to be traded and shared between countries.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
        - 
                    In businnes since 199725+ years providing professional legal documents.
- 
                    Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
- 
                    Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.