Loading
Get Commissioning Report
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Commissioning Report online
Filling out the Commissioning Report online is a crucial step in ensuring compliance with the 2014 Los Angeles Green Building Code and the 2013 California Energy Code. This guide will walk users through the process of completing the report effectively and accurately.
Follow the steps to complete the Commissioning Report online.
- Click ‘Get Form’ button to access the Commissioning Report and open it in your chosen editor.
- Enter the project address in the designated field to specify the location relevant to the Commissioning Report.
- Fill in the permit number, which is crucial for identifying the specific project associated with this report.
- In the 'Executive Summary' section, summarize the commissioning process, including key observations and conclusions from the commissioning program. Ensure to highlight any items that are still outstanding.
- Document the history of any system deficiencies and outline how these issues were addressed, including plans for any seasonal testing that may be scheduled in the future.
- Provide detailed test results and evaluations in the 'Results' section, ensuring clarity on system performance.
- Summarize the training that has been provided as part of the commissioning process, highlighting any scheduled future training.
- Attach any relevant commissioning process documents, including documents like the Commissioning Plan, Owner’s Project Requirements (OPR), Basis of Design (BOD), and any executed installation checklists or Functional Performance Test (FPT) forms.
- In the 'Owner and Commissioning Agent Acknowledgment' section, ensure both the owner/owner representative and commissioning agent review and approve the report by providing their names, company names, and signatures.
- Lastly, finalize the document by filling in the date of approval and any other required information before saving your changes, downloading, printing, or sharing the completed form.
Complete your Commissioning Report online today to ensure compliance and facilitate the final inspection.
Commissioning is a vital step near the end of a plant's construction, its purpose to hand over a safe, efficient and operation-ready facility to the owner. It is the planned coordination and execution of the final stages of construction and the beginning of production.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.