Loading
Get Form 0881a Environmetnal Resource Surface Water Mgmt Permi.
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Form 0881A Environmental Resource Surface Water Management Permit online
Filling out the Form 0881A Environmental Resource Surface Water Management Permit is an essential step for managing surface water resources. This guide provides clear instructions to assist users in completing the form accurately and efficiently through an online platform.
Follow the steps to fill out the form correctly
- Click ‘Get Form’ button to obtain the form and open it in the editor.
- Begin by entering the permit number in the designated field. This number is crucial for identifying your application within the system.
- Next, fill in the project name and the application number(s) associated with this permit. Ensure that the names match any official documents to avoid discrepancies.
- Indicate the phase of the project by selecting the appropriate option. This field helps categorize the stage of development.
- For discharge structures, provide the requested information for all permitted structures. Include details such as structure identification number, type (weir, bleeder), width, crest dimensions, and invert. If additional space is required, attach supplementary sheets as necessary.
- For retention/detention areas, complete the identification number, size in acres, and side slope information. Similar to discharge structures, additional sheets can be attached if there are multiple areas.
- If relevant, confirm the details of the exfiltration trench, including pipe size, invert, trench width, height, and length, with attached documentation.
- For conveyance systems, provide information regarding inlets, pipes, and any other components in the system. Confirm the existence and specifics of ditches, canals, or swales as needed.
- Indicate the benchmark location used to ascertain the elevation data related to the project on your record drawings, adhering to the National Geodetic Vertical Datum standards.
- Complete the certification section by notifying the district of the construction completion and ensuring that all components conform to the approved plans. Ensure that you include your signature, seal, and date.
- Lastly, provide the engineer's name, company name, address, contact number, email, and any applicable authorization number.
Complete your documents online today for a smoother application process.
The Environmental Resource Permit (ERP) Program regulates activities involving the alteration of surface water flows. This includes new activities in uplands that generate stormwater runoff from upland construction, as well as dredging and filling in wetlands and other surface waters.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.