Loading
Get Submit To: Permitplandesk@cityoftacoma.org - Govme.com - Govme
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to use or fill out the Submit To: Permitplandesk@cityoftacoma.org - GovME.com - Govme online
This guide provides step-by-step instructions for completing the energy permit application. By following these directions, you will ensure that your application is filled out accurately and submitted correctly.
Follow the steps to complete your energy permit application online.
- Press the ‘Get Form’ button to retrieve the application form and open it in your preferred editing tool.
- Fill in the site address along with the corresponding zip code, building number, and number of units. Ensure that all information is accurate.
- Enter the application date, issuance date, and building permit number in the respective fields.
- List contact people by providing the contractor's name, phone number, and address, as well as the owner's name, phone number, and address.
- Provide project identification and select the relevant occupancy type by ticking the appropriate boxes, and fill in the total and conditioned square footage.
- Indicate the type of work being performed by selecting new, addition, renovation, or conversion, and specify the number of stories.
- Check the applicable compliance method options and remember to submit documentation if required.
- Fill in the insulation information for slab, wall, floor, and ceiling by providing the respective R-values.
- Provide the glazing information for windows, skylights, and glass doors, including the total square footage and U-values for each, as well as details about low E and argon.
- For doors with less than 50% glazing, enter the U-values and manufacturer information.
- Indicate the type of heating system used by checking the appropriate option and provide the total installed watts or BTU output along with the maximum allowed BTU/watts.
- Attach heat loss calculations and complete the details for the ventilation system, indicating the method and providing information for whole house fans and source-specific fans.
- Sign the application in the designated area and ensure that an inspector's signature is also included if necessary.
- Once completed, save your changes, download the form, print it if needed, or share it as required.
Complete your documents online today to ensure a smooth application process.
You will need a few permits to construct your ADU in Washington. Whether you're building a unit attached to your home or a detached unit, you'll need a construction addition/alteration permit.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.