How to fill out the Application Form For A Permit To Construct online
Completing the Application Form For A Permit To Construct is essential for individuals planning to build or modify a Category II or III dam. This guide provides clear, step-by-step instructions to help users navigate each section of the form online with ease.
Follow the steps to successfully complete your application form.
- Click ‘Get Form’ button to obtain the form and open it in your preferred editor.
- Fill in the general particulars of the dam. Provide the name of the dam, date of classification, and the category of the dam. Make sure to include the departmental file number if applicable.
- Enter the owner's details: surname, first names, identity number, postal address, telephone number, and email address.
- Provide the name and email address of the approved professional person associated with the project.
- Describe the property as indicated on the title deed, including the portion number, magisterial district, nearest town or city, and distance to the nearest town.
- Outline the purpose of the scheme, specifying the water users benefiting from the dam.
- Indicate the type of wall and the quantities of construction materials required such as concrete, rollcrete, rockfill, and earthfill.
- For existing dams, ensure to describe the nature and extent of the proposed alterations.
- Complete the hydrological particulars section, providing data regarding the size of the catchment area, storage capacities, and flood information.
- Detail particulars of hydraulic structures and components including spillway type, dimensions, freeboard, and discharge capacity.
- Assess the stability of the proposed dam by detailing maximum height, wall thickness, and general engineering descriptions of construction materials.
- Note the planned date of commencement and the expected duration of the construction work, along with the contractor's name.
- Indicate the supervision during construction, including the frequency of site inspections and any preparatory work inspections.
- Provide cost estimates for construction and site supervision by the consulting engineer.
- Ensure all necessary documentation, reports, or drawings are included with the application form.
- Once all sections are completed, save your changes. You can download, print, or share your completed form as needed.
Start your Application Form For A Permit To Construct online today to ensure a smooth and successful submission process.
The applicant must wait for permit approval to start any work. The building department legally has 20 business days after submittal to approve or deny, this process does not normally take this long unless there are incompletions with the application.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.