How to fill out the Interconnection Agreement & Application - SECO Energy online
The Interconnection Agreement & Application for customer-owned renewable generation systems is essential for connecting your renewable energy system to the SECO Energy grid. This guide provides clear, step-by-step instructions on how to complete the form online, ensuring a smooth submission process.
Follow the steps to accurately complete the form.
- Press the ‘Get Form’ button to obtain the Interconnection Agreement & Application form and open it for editing.
- Begin by filling out the Applicant Information section. Include your name, mailing address, city, zip code, street address, daytime phone number, fax number, and email. Ensure all details are accurate.
- In the System Information section, check the appropriate box for the type of renewable energy system you are applying for (solar, wind, etc.), and specify the system name/model along with its capacity in kVA.
- List the manufacturers and models for the generator/modules, inverter, and batteries if applicable. Indicate the system location and confirm whether you permit monitoring.
- Proceed to Parts C through G only after the installation has been accepted. Complete the contractor information, including their license number, installation date, and contact information.
- In the Hardware and Installation Compliance section, ensure the system hardware complies with relevant standards. The installation contractor must sign this section, providing their name, date, and company information.
- In the Owner Acknowledgment section, confirm satisfaction with the installation by signing and dating the form.
- Complete the City/County Electrical Code Inspection section by obtaining a signature from the inspector who conducted the compliance check.
- If your system has a capacity rating of 250 kVA or greater, have it approved by a representative of Seminole Electric Cooperative, Inc. in the final section of the application.
- Once all sections are completed, review the document for accuracy. Save any changes and download, print, or share the application as required.
Complete the Interconnection Agreement & Application online today to start your journey toward renewable energy!
Interconnection standards are rules that spell out how projects owned by customers or developers connect to the utility system. These rules provide a standardized process and schedule so that interconnections can be accommodated in an orderly and timely manner.