Loading
Get Bureau Of Resource Protection Drinking Water Program - Mass
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Bureau Of Resource Protection Drinking Water Program - Mass online
This guide provides a clear and supportive approach to completing the Bureau Of Resource Protection Drinking Water Program - Mass application form online. By following these steps, users can ensure they provide all necessary information for their approval to construct a water source.
Follow the steps to successfully complete the application form.
- Click the ‘Get Form’ button to obtain the application form and open it for completion.
- Begin by entering your contact details in the applicant section. Provide your name, address, city, state, zip code, and phone number. Ensure that all contact information is accurate, as it will be used for correspondence regarding your application.
- If applicable, fill in your consultant's information, including their name, address, city, state, zip code, and contact number. This step is important if you are working with a consultant throughout the application process.
- Navigate to the permit section and check the relevant approval type that you are applying for. Ensure you select 'BRP WS 20 to construct Source' for the specified water construction project.
- Complete the application certification section by certifying that all information is accurate and gathered by qualified personnel. This includes providing an authorized signature along with the date, print name, and title.
- Compile necessary supporting documentation. This may include an approved pumping test report, final site plan with an engineer's seal, construction plans, specifications, and any treatment process discussions relevant to the water source.
- Review all checklist items to ensure completeness of the application package, including the MassDEP Transmittal Form, before submission.
- Submit the completed application package and required documentation to the appropriate MassDEP regional office, ensuring you include the application fee of $2,910, submitting the payment and the Transmittal Form separately.
- After final submission, keep a copy of the application for your records, and monitor any correspondence from MassDEP regarding your application status.
Start your application process online today to ensure your water source meets all requirements!
Quabbin and Wachusett Reservoirs The Massachusetts Water Resources Authority (MWRA) and the Department of Conservation and Recreation (DCR) jointly manage the Metropolitan Boston Water System. The MWRA provides treatment and distribution of drinking water to 48 communities in the metropolitan area, including Boston.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.