ELECTRIC RULE 21 PRE-APPLICATION REPORT REQUEST Upon receipt of a complete Pre-Application Report Request and a non-refundable processing fee of $300, the Distribution Provider shall provide a pre-application.

How it works

  1. Open form

    Open form follow the instructions

  2. Easily sign form

    Easily sign the form with your finger

  3. Share form

    Send filled & signed form or save

How to fill out the Rule 21 Pre-application Report Request - San Diego Gas & Electric online

This guide provides clear and comprehensive instructions for completing the Rule 21 Pre-application Report Request online for San Diego Gas & Electric. By following the steps outlined below, you will be able to successfully fill out and submit your request.

Follow the steps to complete your Pre-application Report Request form.

  1. Press the 'Get Form' button to obtain the form and open it in your preferred online editor.
  2. Select the purpose of your request by checking only one option: either 'A proposed new Generating Facility' or 'An increase in the generating capacity or a Material Modification of an existing Generating Facility.'
  3. Indicate whether your project will export power to the SDG&E system by checking one of the options: 'A project that will export power to the SDG&E system' or 'A project that will not export power to the SDG&E system.'
  4. Provide detailed information about the proposed Point of Interconnection. This includes the latitude and longitude, utility equipment number, meter number, and the specific address of the project location.
  5. Attach a site map showing true north, project location, service point location, and nearby major roads or streets.
  6. Fill in the generation technology and fuel source for your project in the available fields, indicating the MW capacity for each type.
  7. Complete the applicant information section, providing the name, title, company, contact information, and email of the primary person who will be contacted.
  8. Record the non-refundable processing fee amount of $300, as specified in Rule 21, for completion of the Pre-Application Report Request.
  9. Submit the completed form with any necessary attachments to the specified address or email provided in the instructions.
  10. Review the form one last time for accuracy and completeness before final submission.
  11. Upon successful submission, you can save changes, download, print, or share the form as needed.

Begin filling out your Rule 21 Pre-application Report Request online today to ensure a smooth submission process.

Get form

Experience a faster way to fill out and sign forms on the web. Access the most extensive library of templates available.
Get form

Related content

Rule 21 Interconnection - California Public...
Electric Rule 21 is a tariff that describes the interconnection, operating and metering...
Learn more
The Stepping Stones to Developing a Small Scale...
How to Navigate interconnection under Rule 21. 14. Beginning ... Filing an Application for...
Learn more
United States Border Patrol - Wikipedia
The United States Border Patrol (USBP) is the United States Customs and Border...
Learn more

Related links form

Lamar University Sbec Certification Form Sfn 19145 0110 Form Mt Sac Email Form COBRA Request For Service Form - AmeriFlex

Questions & Answers

Get answers to your most pressing questions about US Legal Forms API.

Contact support

Rule 21 governs CPUC-jurisdictional interconnections, which include the interconnection of all net energy metering (NEM) facilities, "Non-Export" facilities, and qualifying facilities intending to sell power at avoided cost to the host utility.

Electric Generation Interconnection (EGI)

Off-peak hours: Hours of the day that have low energy demand resulting in lower prices. In general, off-peak hours are all hours outside of 4 p.m. to 9 p.m. Various energy pricing plans can have “super off-peak” time periods that offer even lower prices.

1. Every motion to the Court shall clearly state its purpose and the facts on which it is based and may present legal argument in support thereof. No separate brief may be filed.

Rule 21 outlines how distributed generation systems should be evaluated by the utility to physically interconnect to the grid. What it accomplishes is threefold: It sets up a fixed fee for the connection application. It sets fixed timelines for when the utility has to return its interconnection review to the customer.

Electric Rule 21 describes the interconnection, operating and metering requirements for generation facilities to be connected to a utility's distribution system, over which the California Public Utilities Commission (CPUC) has jurisdiction.

Except as provided otherwise in the rate schedule or contract required thereby, a customer may request only one rate schedule change or change the contract in effect for the purpose of obtaining preferential rates, priority of service, or avoiding minimum charges in any twelve-month period; however, if the customer's ...

Get This Form Now!

Use professional pre-built templates to fill in and sign documents online faster. Get access to thousands of forms.
Get form
If you believe that this page should be taken down, please follow our DMCA take down processhere.

Industry-leading security and compliance

US Legal Forms protects your data by complying with industry-specific security standards.
  • In businnes since 1997
    25+ years providing professional legal documents.
  • Accredited business
    Guarantees that a business meets BBB accreditation standards in the US and Canada.
  • Secured by Braintree
    Validated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.
Get Rule 21 Pre-application Report Request - San Diego Gas & Electric
Get form
Form Packages
Adoption
Bankruptcy
Contractors
Divorce
Home Sales
Employment
Identity Theft
Incorporation
Landlord Tenant
Living Trust
Name Change
Personal Planning
Small Business
Wills & Estates
Packages A-Z
Form Categories
Affidavits
Bankruptcy
Bill of Sale
Corporate - LLC
Divorce
Employment
Identity Theft
Internet Technology
Landlord Tenant
Living Wills
Name Change
Power of Attorney
Real Estate
Small Estates
Wills
All Forms
Forms A-Z
Form Library
Customer Service
Terms of Service
Privacy Notice
Legal Hub
Content Takedown Policy
Bug Bounty Program
About Us
Help Portal
Legal Resources
Blog
Affiliates
Contact Us
Delete My Account
Site Map
Industries
Forms in Spanish
Localized Forms
State-specific Forms
Forms Kit
Legal Guides
Real Estate Handbook
All Guides
Prepared for You
Notarize
Incorporation services
Our Customers
For Consumers
For Small Business
For Attorneys
Our Sites
US Legal Forms
USLegal
FormsPass
pdfFiller
signNow
airSlate WorkFlow
DocHub
Instapage
Social Media
Call us now toll free:
+1 833 426 79 33
As seen in:
  • USA Today logo picture
  • CBC News logo picture
  • LA Times logo picture
  • The Washington Post logo picture
  • AP logo picture
  • Forbes logo picture
© Copyright 1997-2025
airSlate Legal Forms, Inc.
3720 Flowood Dr, Flowood, Mississippi 39232
Form Packages
Adoption
Bankruptcy
Contractors
Divorce
Home Sales
Employment
Identity Theft
Incorporation
Landlord Tenant
Living Trust
Name Change
Personal Planning
Small Business
Wills & Estates
Packages A-Z
Form Categories
Affidavits
Bankruptcy
Bill of Sale
Corporate - LLC
Divorce
Employment
Identity Theft
Internet Technology
Landlord Tenant
Living Wills
Name Change
Power of Attorney
Real Estate
Small Estates
Wills
All Forms
Forms A-Z
Form Library
Customer Service
Terms of Service
Privacy Notice
Legal Hub
Content Takedown Policy
Bug Bounty Program
About Us
Help Portal
Legal Resources
Blog
Affiliates
Contact Us
Delete My Account
Site Map
Industries
Forms in Spanish
Localized Forms
State-specific Forms
Forms Kit
Legal Guides
Real Estate Handbook
All Guides
Prepared for You
Notarize
Incorporation services
Our Customers
For Consumers
For Small Business
For Attorneys
Our Sites
US Legal Forms
USLegal
FormsPass
pdfFiller
signNow
airSlate WorkFlow
DocHub
Instapage
Social Media
Call us now toll free:
+1 833 426 79 33
As seen in:
  • USA Today logo picture
  • CBC News logo picture
  • LA Times logo picture
  • The Washington Post logo picture
  • AP logo picture
  • Forbes logo picture
© Copyright 1997-2025
airSlate Legal Forms, Inc.
3720 Flowood Dr, Flowood, Mississippi 39232