Loading
Get Application For Approval To Construct Drinking Water Facilities - Azdeq
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Application For Approval To Construct Drinking Water Facilities - Azdeq online
Filling out the Application For Approval To Construct Drinking Water Facilities is a critical step in obtaining authorization for constructing public drinking water systems in Arizona. This guide provides clear and detailed instructions to assist users in completing the form accurately and effectively.
Follow the steps to complete your application online.
- Click ‘Get Form’ button to access the form and open it in the editing interface.
- Begin by entering the required project information, including the project name and description. Ensure that the name aligns with designated guidelines, such as using 'XXX Subdivision' for specific subdivisions.
- Provide applicant details including name, title, phone number, firm name, and mailing address. If you are applying on behalf of another person, include their details as well.
- Fill out the site information section, detailing the county, township, latitude and longitude, and nearest city. This information is essential for identifying the project location.
- Indicate any existing environmental permits related to your project, and provide necessary details if applicable.
- Complete the supplemental information section. This includes the water system details, service agreements, and site plans. Ensure all boxes are checked for items you have completed.
- Select the components of your water system and provide relevant information such as the number of connections, average design flow, peak daily demand, and fire flow requirements.
- If your application includes water treatment or blending plans, provide the appropriate capacity and treatment details.
- Attach construction quality drawings and ensure they meet the required specifications for review. A design report that includes calculations and signed documents by a registered engineer should also be included.
- Complete the certification statements, ensuring accuracy in all representations made in the application. This includes signatures and dates from both the applicant and their agent.
- Review all provided information for completeness and accuracy. Once confirmed, you can save changes, download, print, or share the form as needed.
Start the application process online today to ensure your drinking water construction project meets all requirements.
An estimated 300,000 or more Arizonans get their drinking water from private wells – wells not subject to public water system regulations.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.