Loading
Get Application To Interconnect Small Generation 100 Kw Or Less Sc Form
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to use or fill out the Application To Interconnect Small Generation 100 Kw Or Less Sc Form online
Filling out the Application To Interconnect Small Generation 100 kW Or Less Sc Form online is an essential step for users intending to operate an interconnected generating facility. This guide will walk you through the necessary steps to complete the form accurately and efficiently.
Follow the steps to successfully complete the online form.
- Press the ‘Get Form’ button to access the form, and open it in your preferred online editor.
- In Section 1, provide your contact information. Fill in your name, email address, US mail address, city, state, zip code, and both daytime and alternate phone numbers.
- Also in Section 1, include the installer’s information. Enter their name, date, phone number, US mail address, city, state, zip code, company name, and electrical/contractor license number.
- Continue in Section 1 by filling out the electrical inspector’s name, the county, and their phone number.
- Move on to Section 2, where you will enter the generator and facility information. Provide the facility location if it differs from the contact address, electric utility name, and account number.
- Indicate your customer type by checking the appropriate box for residential, commercial, or other. Specify if an existing interconnected generator is at this facility.
- Provide the total proposed aggregate generation output rating (in kW) and fill in the details for up to three generators or inverters, including energy source, manufacturer name, model name and number, nameplate rating, and nominal voltage.
- If applicable, specify the details of the customer-owned transformer, including the manufacturer, type, and ratings. Remember to attach the transformer manufacturer specifications.
- In Section 3, enter the proposed installation date and the proposed interconnection date.
- In Section 4, ensure that you certify the compliance of the interconnection protection system and all information provided. Sign the application and date it accordingly.
- Finally, attach the application fee along with the one-line electrical drawing of the installation. Prepare to submit the application to the designated utility representative.
- Once the form is complete, you can save changes, download a copy, print the form, or share it as needed.
Complete your documents online to ensure a smooth application process.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.