Loading
Get Pump Station Permits Dhec South Carolina Form
How it works
-
Open form follow the instructions
-
Easily sign the form with your finger
-
Send filled & signed form or save
How to fill out the Pump Station Permits Dhec South Carolina Form online
Completing the Pump Station Permits Dhec South Carolina Form is essential for reporting any sewer system overflow or pump station failures. This guide will provide you with a clear and concise walkthrough of each section and field to streamline your online completion of the form.
Follow the steps to successfully fill out the form.
- Click ‘Get Form’ button to access the Pump Station Permits Dhec South Carolina Form.
- In the first section, enter the permittee's name along with the permit number and county. If your system is not owned or operated by a publicly owned treatment works (POTW), mention the name of the receiving POTW.
- Record the date and time of the sewer system overflow or failure in the respective fields.
- Document the date and time you notified DHEC regarding the failure.
- Provide the name of the person contacted at DHEC for this report.
- Describe the source of the overflow or failure (e.g., manhole, pump station) and include the specific pump station number or any identifying codes.
- Indicate the location of the overflow or failure with a street address or a detailed description; attaching a map if available is beneficial.
- Explain the cause of the overflow or failure, including any relevant weather conditions that may have contributed.
- Outline the control actions taken in response to the overflow or failure.
- Detail the corrective actions taken to rectify the issue.
- Estimate the volume of wastewater that was released.
- Specify whether the wastewater entered a stream or body of water, circling 'Yes' or 'No.' If 'Yes,' include the exact location.
- Indicate if downstream water intakes were notified and provide the name of the contact if applicable.
- Enter the date when corrective actions were completed and the date of cleanup action taken, including respective times.
- Describe the cleanup process in detail.
- Finally, fill in your phone number, name, and signature as the person initiating the action, along with the date. Ensure the signature of the sewer system owner or responsible individual is included.
- After completing all sections of the form, save the changes, and you may choose to download, print, or share the completed form.
Complete your Pump Station Permits Dhec South Carolina Form online today to ensure timely reporting and compliance.
If your shed is smaller than 200 sq. ft., the building permit requirements are voided. However, before starting your project, you will still need to submit an application and have it approved by your local municipality.
Industry-leading security and compliance
US Legal Forms protects your data by complying with industry-specific security standards.
-
In businnes since 199725+ years providing professional legal documents.
-
Accredited businessGuarantees that a business meets BBB accreditation standards in the US and Canada.
-
Secured by BraintreeValidated Level 1 PCI DSS compliant payment gateway that accepts most major credit and debit card brands from across the globe.